Plant implementationRefurbishment of the sewage sludge incineration plant at SAIDEF Fribourg
Following the completion of a condition analysis of the sewage sludge incineration plant (KSV) at SAIDEF, its management commissioned B+T Engineering AG with the complete refurbishment of the plant.
This mandate includes, in particular, the replacement of the saturated steam boiler, the replacement of the electrostatic precipitator with a fabric filter including a lime/bicarbonate injection system, and the refurbishment of the entire flue gas scrubber system.